Project consisted of mitigation of an existing landslide, slope failed and was undermining the concrete deck of swimming pool, Poor drainage/high pore water pressure contributed to slide, FGA used as ultra-lightweight fill to rebuild slope and reduce the driving forces of the landslide, The high permeability of FGA helped to outlet the pore water in slope soils to underdrain installed below the FGA fill.