Staged construction of ramp onto Southbound I-95 in Philadelphia, MSE ramp with FGA backfill built over compressible soils adjacent to foundations for the existing ramp, FGA used to reduce settlement and lateral spreading of soil against adjacent foundations, one side of MSE ramp with FGA backfill built against abutment and wingwall and other side built with wirewall facing.